Termite Control Technician Job Description - Questions

Things about Termite Control Tenting


Many new buildings utilize a termicide treated layer of soil surrounding and under the building. This creates an integrated barrier, together with the physical methods mentioned previously. The termicide is placed on the soil under the slab and around the footings, pipes, conduits and other structures of the house during construction to create a vertical barrier.

Timber used to construct houses, outbuildings, fences and other outdoor structures can be treated with substances. These are commonly referred toas treated timbers and should be considered in the time of designing or constructing the buildings.

The smart Trick of Termite Control Tenting That Nobody is Discussing


To successfully incorporate termite barriers into existing buildings, strategic drilling through concrete slabs, porches, flooring and wall footings might be needed, as well as under floor treatment.

Building and Energy recommends only licensed pest controllers execute this work. Chemical baits Strategically put bait stations can be used to lure termites to a food source, such as dry wood or paper deny. About 30 bait stations are needed for a normal home and they need to be inspected often to evaluate termite activity. .

Once the termites are attracted to the bait station, a particular termicide is inserted that sticks to the termite.

Some Of Termite Control Techniques


To take care of termites in the garden, specialised pest managers drill into timber or the trunk of a tree to insert temperature probes that help to locate the termite nest.  Despite regular inspections of the garden, termites may still enter the house. In the house, first indicator might be a small discolouration of a wall , followed by warping if timber panelling is used to line the wall.

Take time to investigate the size and nature of the problem in addition to the options available for termite eradication. .

Whichever system you select, it's important to do routine inspections in particular inspect your house every six months for any apparent signs of infestation. Building and Energy recommends you arrange for an inspection by a licensed pest control operator at least once a year to look for signs of infestation and also to undertake any preventative steps. .

5 Easy Facts About Termite Control Technician Job Description Shown


For existing buildings, in which you have found signs of infestation, chemical treatment is usually the only option for destroying the termite nest. This treatment can include re-establishing a chemical and/or physical barrier plus regular inspections look at here now to discover any ongoing or new termite activity.

Treatment using a termicide directly into tunnels of this nest where termites are known to be more active can reduce numbers, but it rarely eliminates the colony altogether unless it is used in conjunction with another method.

Little Known Questions About Termite Control Technician Job Description.


When buying an existing home, Consumer Protection recommends including a White Ant Certificate clause in the Offer and Acceptance form. This is intended to make certain the home is free of termites and there is no structural damage from any previous infestation. A separate fact sheet concerning the need for wood pest inspections and reports when buying home is available in the Department of Commerce by contacting the Consumer Protection Advice Line on 1300 304 054. .

If you're constructing a new home or building or renovating an existing one you need to comply with the termite risk management and barrier requirements of the National Construction Code (NCC) and relevant standards. In the majority of situations a building permit will be needed prior to carrying out building work and the details of the sort of termite barrier should be submitted as part of the building permit application procedure.

The 8-Minute Rule for Termite Control Technician Job DescriptionTermite Control Technician Job Description Fundamentals Explained

Unknown Facts About Termite Control Technician Job Description


The NCC requirements aim to decrease the risk of termite damage to main building elements which are mostly the structural click here now elements of a building butdo not include non-structural elements like cabinet work and furniture.

It's a requirement of the NCC that a durable notice be permanently fixed to the building in a prominent location, such as in a meter box or the like. The notice should indicate the type and method of termite risk management and the date that the system has been installed, along with the installers or manufacturers recommendations for the scope and frequency of future inspections.

For specific information about termite protection for a planned new residence, contact a building surveyor, a builder or architect or a licensed pest control professional.

More About Termite Control Techniques


If you've had building work completed in the past six decades and the contractor did not offer termite protection as needed from the NCC, you can refer the matter to the Building and Energy.

Plumbing leaks, drainage problems and roof leaks should be dealt with quickly, as moist conditions attract termites.

Excitement About Termite Control TechniquesThe Of Termite Control Techniques

Fascination About Termite Control Technician Job Description


Garden beds and plants should be stored away from direct contact with walls. Hard paving ought to be substituted.

Leave a Reply

Your email address will not be published. Required fields are marked *